Skip to content
Snippets Groups Projects
Commit 45fed2a3 authored by Jil Fischbach's avatar Jil Fischbach
Browse files

removed img/ .. /

parent bb363c1c
No related branches found
No related tags found
2 merge requests!250[release] Regular merge of develop,!249add lab cards from internal
......@@ -13,7 +13,7 @@ This section describes the procedure for replacement of gas bottles.
2. Replace the empty bottles in room S130
<div align="center">
<img src="img/../p.5.2_img-1.jpg">
<img src="p.5.2_img-1.jpg">
</div>
* Check the gas level on the manometer (5 on the picture). When empty, it displays 0 bar.
......@@ -30,14 +30,14 @@ This section describes the procedure for replacement of gas bottles.
* Check for any leak after connecting the bottle using the leak detector spray, an example is shown on the picture below
<div align="center">
<img src="img/../p.5.2_img-2.jpg" height="250">
<img src="p.5.2_img-2.jpg" height="250">
</div>
4. Fill up the “gas bottle exchange record sheet” (LCSB-INF-01-A-03) on the door inside the gas deposit room.
A copy of this document is present in each gas deposit room.
<div align="center">
<img src="img/../p.5.2_img-3.jpg">
<img src="p.5.2_img-3.jpg">
</div>
1. Notify the Facility Manager, the LCSB duty call manager and their backup by email and fill the [Duty call report form](https://ulsurvey.uni.lu/index.php/936567?lang=en)
\ No newline at end of file
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment