Skip to content
Snippets Groups Projects
Commit 9500d111 authored by Laurent Heirendt's avatar Laurent Heirendt :airplane:
Browse files

new header

parent 31d18540
No related branches found
No related tags found
No related merge requests found
--- ---
layout: page layout: page
permalink: /internal/lab/p.8.1_cryo-storage_bt2/ permalink: /internal/lab/p.8.1_cryo-storage_bt2/
shortcut: lab:p.8.1_cryo-storage_bt2
redirect_from:
- /cards/lab:p.8.1_cryo-storage_bt2
- /internal/cards/lab:p.8.1_cryo-storage_bt2
--- ---
# P8.1 Cryo storage BT2 # P8.1 Cryo storage BT2
This section describes the procedure in the event of low nitrogen levels in both the cryo storage and cryocyl-120 tanks (BT2, room SS1 003). This section describes the procedure in the event of low nitrogen levels in both the cryo storage and cryocyl-120 tanks (BT2, room SS1 003).
<div align="center"> <div align="center">
<img src="p8.1_img-1.jpg" height="300"> <img src="p8.1_img-1.jpg" height="300">
</div> </div>
1. If the issue is not the nitrogen level and the temperature cannot be held below -120°C, transfer the content of the cryostorage to the back up -80°C freezer LCSB0709 in the same room, see “P6: Freezer failure back up plan”. 1. If the issue is not the nitrogen level and the temperature cannot be held below -120°C, transfer the content of the cryostorage to the back up -80°C freezer LCSB0709 in the same room, see “P6: Freezer failure back up plan”.
|*Personal protective equipment*| |*Personal protective equipment*|
|:-----------------------------:| |:-----------------------------:|
|Lab coat| |Lab coat|
|Cryogloves| |Cryogloves|
|Safety goggles| |Safety goggles|
2. If the issue comes from the nitrogen level, verify whether the cryocyl-120 tanks is empty by pressing on “press” on the level gauge panel: in that case, 0% is displayed 2. If the issue comes from the nitrogen level, verify whether the cryocyl-120 tanks is empty by pressing on “press” on the level gauge panel: in that case, 0% is displayed
<div align="center"> <div align="center">
<img src="p8.1_img-2.jpg" height="200"> <img src="p8.1_img-2.jpg" height="200">
</div> </div>
3. If the cryocyl-120 is empty, it needs to be replaced by the liquid nitrogen tank standing in the same room. 3. If the cryocyl-120 is empty, it needs to be replaced by the liquid nitrogen tank standing in the same room.
* Unplug the black wire (power supply) of the right data logger (FW-Z 0,5) and secure the probe on the dedicated rack on the cryocyl-120 tank. * Unplug the black wire (power supply) of the right data logger (FW-Z 0,5) and secure the probe on the dedicated rack on the cryocyl-120 tank.
<div align="center"> <div align="center">
<img src="p8.1_img-3.jpg"> <img src="p8.1_img-3.jpg">
</div> </div>
4. Close gas valve number 1 on the cryocyl-120 tank. 4. Close gas valve number 1 on the cryocyl-120 tank.
<div align="center"> <div align="center">
<img src="p8.1_img-4.jpg"> <img src="p8.1_img-4.jpg">
</div> </div>
5. Unscrew the tubing connected to valve 1 using the wrench available in the duty call toolbox in the gas deposit rooms (Appendix 04) 5. Unscrew the tubing connected to valve 1 using the wrench available in the duty call toolbox in the gas deposit rooms (Appendix 04)
6. Move the cryocyl-120 tank to the middle of the room 6. Move the cryocyl-120 tank to the middle of the room
7. Unscrew the tubing connected to the liquid nitrogen tank and place the tank next to the cryo storage tank 7. Unscrew the tubing connected to the liquid nitrogen tank and place the tank next to the cryo storage tank
<div align="center"> <div align="center">
<img src="p8.1_img-5.jpg" height="300"> <img src="p8.1_img-5.jpg" height="300">
</div> </div>
8. Screw the tubing from the cryo storage tank to the “Filling, withdrawal valve” valve (valve 1) of the liquid nitrogen tank using the wrench available in the duty call toolbox in the gas deposit rooms (Appendix 04) 8. Screw the tubing from the cryo storage tank to the “Filling, withdrawal valve” valve (valve 1) of the liquid nitrogen tank using the wrench available in the duty call toolbox in the gas deposit rooms (Appendix 04)
9. Fully open valve 1, then close it back a ¼ turn 9. Fully open valve 1, then close it back a ¼ turn
<div align="center"> <div align="center">
<img src="p8.1_img-6.jpg"> <img src="p8.1_img-6.jpg">
</div> </div>
10. Check that the liquid nitrogen percentage of the cryo storage tank increases (wait for 10 minutes) 10. Check that the liquid nitrogen percentage of the cryo storage tank increases (wait for 10 minutes)
11. Notify the LCSB duty call manager and their backup by email, fill and fill the [Duty call report form](https://ulsurvey.uni.lu/index.php/936567?lang=en) 11. Notify the LCSB duty call manager and their backup by email, fill and fill the [Duty call report form](https://ulsurvey.uni.lu/index.php/936567?lang=en)
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment