Skip to content
Snippets Groups Projects
Commit c6a7c2bf authored by Jil Fischbach's avatar Jil Fischbach
Browse files

removed img/../

parent ae9903e7
No related branches found
No related tags found
No related merge requests found
......@@ -7,7 +7,7 @@ permalink: /internal/lab/p.8.1_cryo-storage_bt2/
This section describes the procedure in the event of low nitrogen levels in both the cryo storage and cryocyl-120 tanks (BT2, room SS1 003).
<div align="center">
<img src="img/../p8.1_img-1.jpg" height="300">
<img src="p8.1_img-1.jpg" height="300">
</div>
1. If the issue is not the nitrogen level and the temperature cannot be held below -120°C, transfer the content of the cryostorage to the back up -80°C freezer LCSB0709 in the same room, see “P6: Freezer failure back up plan”.
......@@ -23,7 +23,7 @@ This section describes the procedure in the event of low nitrogen levels in both
2. If the issue comes from the nitrogen level, verify whether the cryocyl-120 tanks is empty by pressing on “press” on the level gauge panel: in that case, 0% is displayed
<div align="center">
<img src="img/../p8.1_img-2.jpg" height="200">
<img src="p8.1_img-2.jpg" height="200">
</div>
3. If the cryocyl-120 is empty, it needs to be replaced by the liquid nitrogen tank standing in the same room.
......@@ -31,13 +31,13 @@ This section describes the procedure in the event of low nitrogen levels in both
* Unplug the black wire (power supply) of the right data logger (FW-Z 0,5) and secure the probe on the dedicated rack on the cryocyl-120 tank.
<div align="center">
<img src="img/../p8.1_img-3.jpg">
<img src="p8.1_img-3.jpg">
</div>
4. Close gas valve number 1 on the cryocyl-120 tank.
<div align="center">
<img src="img/../p8.1_img-4.jpg">
<img src="p8.1_img-4.jpg">
</div>
5. Unscrew the tubing connected to valve 1 using the wrench available in the duty call toolbox in the gas deposit rooms (Appendix 04)
......@@ -47,7 +47,7 @@ This section describes the procedure in the event of low nitrogen levels in both
7. Unscrew the tubing connected to the liquid nitrogen tank and place the tank next to the cryo storage tank
<div align="center">
<img src="img/../p8.1_img-5.jpg" height="300">
<img src="p8.1_img-5.jpg" height="300">
</div>
8. Screw the tubing from the cryo storage tank to the “Filling, withdrawal valve” valve (valve 1) of the liquid nitrogen tank using the wrench available in the duty call toolbox in the gas deposit rooms (Appendix 04)
......@@ -55,7 +55,7 @@ This section describes the procedure in the event of low nitrogen levels in both
9. Fully open valve 1, then close it back a ¼ turn
<div align="center">
<img src="img/../p8.1_img-6.jpg">
<img src="p8.1_img-6.jpg">
</div>
10. Check that the liquid nitrogen percentage of the cryo storage tank increases (wait for 10 minutes)
......
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment